Phase
III Hanger Project
|
| Prime
Mechanical Contractor: |
The Jamar
Company |
The Jamar
Architectural Division recently completed the standing
seam metal panel roof system on the Minnesota Air National
Guard Phase III Hanger Project.
This project
was unique in the fact that all panels were specified
by the full length with no transverse seams. The gable
roof structure utilized panels with lengths up to 138
lineal feet. This required special roll forming equipment
and engineered scaffolding to allow the panels to be
run on the roof at the site. The handling of panels
of this length required ten men for each panel.
|