DHTML Menu, (c)2004 Apycom
Jamar Jamar Home
Solid Partners. Solid Solutions.
HVAC
 
 
St. Mary's Duluth Clinic
St. Mary's Duluth Clinic
JAMAR COMPANY RECENTLY COMPLETED THE ST. MARY'S DULUTH CLINIC EXPANSION

Leadership in Energy and Environmental Design
The Jamar Company recently completed the St. Mary's/Duluth Clinic expansion in Duluth. This project is a registered LEED project. LEED, or Leadership in Energy and Environmental Design, was created to define 'green building' by establish a common standard of measurement, promote integrated, whole-building design practices, recognize environmental leadership in the building industry and to raise consumer awareness of green building benefits. Some of the individual efforts Jamar worked on to help this project earn this classification was working with water reduction and efficiency along with a chemical free water treatment system, CO2 monitoring and installing high efficiency motors.
 
St. Mary's Duluth Clinic
St. Mary's Duluth Clinic
Mechanical system highlights include:

  • Two 200 HP low pressure steam boilers with fuel oil back-up.
  • 820 ton variable primary cooling loop with one Trane centrifugal chiller and one induced draft, cross flow cooling tower both utilizing variable frequency drives.
  • Dolphin chemical free water treatment system for HVAC condenser water.
  • Variable air volume air distribution system utilizing five custom double wall air handlers with over 200,000 CFM in all.
  • Medical gas system including oxygen, medical air and vacuum.
  • 20,000 linear feet of snow melt tubing.
  • Medical chillers with emergency backup for three MRIs, two CRTs and two linear accelerators.
  • Johnson Controls direct digital control/energy management system including lighting controls.
Leadership in Energy and Environmental Design
Architectural system highlights include:

  • 35,000 s/f below grade foundation waterproofing.
  • 8,000 s/f hot applied terrace waterproofing including a high grade terrace paver system.
  • 9,000 s/f in traffic coatings.
  • 786,000 s/f ballasted and fully adhered EPDM systems.
  • 3,000 s/f high performance architectural louvers.
  • 2,500 s/f aluminum plate column, soffit and skywalk panels.
  • 10,000 s/f field assembled metal wall panel systems.
  • 2,100 s/f field assembled soffit panel systems.

Back

St. Mary's Duluth Clinic
 
Home About Us Offices Contact Us News Safety Quality Control Links Projects Customer Survey
Professional Services Metal Fabrication Boiler Services Process Piping Industrial Air Systems Commercial Lite Commercial and Service Architectural Distribution Division HVAC
© 2005 Jamar Company