Alliant Energy – Edgewater Generating Station

Sheboygan, WI
  • Unit #5 Boiler Superheater element replacement
  • Reinforced building steel in order to remove wind brace
  • Opened boiler side wall for element access
  • Removal of existing superheat elements
  • Designed and fabricated element transport and lifting jig
  • Installed elements weighing 10,555 lbs each through the
    bottom using cart/rail system
  • Annual boiler maintenance on Unit #5