United States Steel Corporation

Mt. Iron, MN

Line #3 Waste Gas Scrubber Project:

  • Fabrication and Installation of Duct, Water Injection and
    Water Treatment.
  • Pipe: 8,960’ / Steel & Duct: 405,530 lbs.
  • Total Man Hours: 80,792 of Jamar Direct Labor (not
    including subs)
  • Safety: Provided owner with digital copies of all safety
    documentation
  • Foundation work
  • Structural steel
  • Electrical

Major equipment installation:

  • Multi-Clone dust collector
  • Drop out box
  • ID fan and associated ductwork
  • Wet scrubbers
  • Thickener tank, lime silo and slurry tank
  • Pumps, miscellaneous equipment and all associated
    process piping
  • Instrumentation
  • Insulation/Lagging